PORT INFO TELUK BAYUR, PADANG:
1. Padang port is called Teluk Bayur, Position :
LAT. 001 – 01 – 10 South
LONG. 100 – 22 – 20 East
(Approx. One and Half Miles from the breakwater)
2. Pilot Station on Channel 12 & 14,Duty 24 Hours/Day
3. Restriction only Draft dan LOA
– Wharf No. 1
Lenght : 150 M
Max Draft : 9.5 M
Max Beam : 35 M
Air Draft : Unlimit
– Wharf No. 2
Lenght : 148 M
Max Draft : 9.5 M
Max Beam : 35 M
Air Draft : Unlimit
– Wharf No. 3
Lenght : 142 M
Max Draft : 9.1 M
Max Beam : 35 M
Air Draft : Unlimit
(Wharf No. 1 upto 3, straight position)
– Wharf No. 4
Lenght : 125 M
Max Draft : 9.2 M
Max Beam : 35 M
Air Draft : Unlimit
– Wharf No. 5
Lenght : 115 M
Max Draft : 9.3 M
Max Beam : 35 M
Air Draft : Unlimit
– Wharf No. 6
Lenght : 107 M
Max Draft : 9.8 M
Max Beam : 35 M
Air Draft : Unlimit
(Wharf No. 4 upto 6, straight position)
– Dermaga Khusus Batu Bara (DKB) / SPECIAL COAL JETTY
Lenght : 200 M
Max Draft : 10.00-10.20 M
Max Beam : 35 M A
Air Draft : From Water level 13 M
Sailing time waiting for High Tide)
4. At Wharf no. 1 upto 6, The loading method by using bucket or grabs by vessel’s crane/Derrick and by 4 gangs
The contain capacity of Box approx. 8 MT.
The vessel’s Crane/derrick must be suitable with min 15 MT – 20 MT/SWL.
Average loading Rate abt 5000 MT/Day.
If the vessel berthing/sailing in max draft must be waiting for high tide
5. For safe berthing during loading with Draft more than 9.0 M, strongly recommend to use 2 (two) units additional rubber fender (size 1.5 x 2 m) with hire cost Usd 5,000
6. Night Berthing/Un-berthing is possible depend on Sea and weather condition
7. Weather Condition : Rainy Season
8. Working time :
– 08.00 – 12.00
– 12.00 – 13.00 Mealtime
– 13.00 – 18.00
– 18.00 – 20.00 Rest Time
– 20.00 – 24.00
– 00.00 – 01.00 Mealtime
– 01.00 – 06.00
– 06.00 – 08.00 Rest Time
9. Padang is a busy port/congestion and normally vessel waiting 1 – 2 days for berthing
10. Ballast water : NIL
11. Bunker supply by Barge